中文
Select Page

You may also like

Featured
Community soap, balcony singalongs and other good Samaritan stories

Community soap, balcony singalongs and other good Samaritan stories

If your view of the world is based on daily news reports, then one can conclude we will all continue...
6 things you can do to stay entertained while self-isolating at home

6 things you can do to stay entertained while self-isolating at home

With Coronavirus triggering a nation-wide quarantine, many Aussies are experiencing a bad case of the self-isolation blues. If you’re bored...
Foods to boost your immune system and help fight off colds, flu and COVID-19

Foods to boost your immune system and help fight off colds, flu and COVID-19

Eating a healthy and balanced diet is key to building your immune system, so a major global pandemic is probably...

Edith Cowan University Building 34

Constructed by PACT Construction and designed by esteemed architects JCY, Building 34 at ECU Joondalup is both visually striking and structurally complex.

    Details

    • Institutional Designs:Education,Office,Research
    • Landscape Designs:Education,Office,Research

    Description

    PACT Construction was one of 10 other builders invited to submit their interest in this groundbreaking five-storey project, and upon being shortlisted, were successful in their bid.

    “While we weren’t the largest construction company under consideration, our strong relationship with JCY, cost effective methods, collaborative approach and track record delivering considerably large projects certainly helped us stand apart,” PACT Construction general manager Jason Kunkler said.

    Constructed to meet a five star energy efficiency rating, Building 34 has brought all student facilities under one roof, utilising state-of-the art technology such as large LED panels.“The full wrap-around façade was certainly a major challenge,” Mr Kunkler said. “Combined with the glazing, it forms the complete sun shading element of the building. We were responsible for the design and construction of both the glazing and cladding. Internally, we have delivered a vast internal atrium and utilise, a podium level slab with facetted formwork.”

    Also of a complex nature was the delivery of services. PACT was required to construct in-ground ductwork, which delivers airflow from the existing university system into the new building. In addition, all works were carried out in the landscape of a busy, fully functional university, resulting with a wide range of access, noise and safety issues. “While this exciting project was not without its challenges, our collaborative approach was extremely effective at identifying issues and satisfying all parties’ concerns,” Mr Kunkler said.

    Project Value: $48.6 Million
    Construction Time: 88 weeks